top of page

one za'abeel

A twin tower masterplan resting on a xxx plot Podium either side of a busy highway. Twin tower connected by a 230m sky light. 
ROLE AND RESPONSIBILITY
Ensuring fully coordinated design between multidisciplinary teams.
Creation of ETABS, SAFE Models and production of structural designs.
Attended and participated in peer reviews and design workshops.
Design and Coordination gravity and seismic analysis.
Obtaining building permit approval for Podium 
IMG_0571.PNG

Feb 2015- AUG 2017

IMG_0589.PNG

AUG 2017-JAN 2018

meeras bvlgari: hotels and residence

dubai metro expansion 2020

The project is a 14.5 kilometre extension of the Dubai Metro from Nakheel Harbour & Tower Station to the Expo 2020 site in Dubai World Central.
ROLE AND RESPONSIBILITY
Ensuring a fully coordinated design with other disciplines.
Production and checking of drawings from draftsmen.
Reviewing and assisting team leader engineer in the design production
Bulgari Hotel and Residences consisted of two Hotels, North and South Hotel. The hotels were G+4 a midrise building governed by siemic forces and gravity loads.
ROLE AND RESPONSIBILITY
  • Responsible for analyzing the Structural ETABS model of the Hotel structure and produce calculations and drawings of the horizontal elements (floor slabs & beams) of the hotel.

  • Support the Lead Engineer with coordination with Building Services and Architect.

  • Performed independent design verification of  the design completed by other colleagues based on internal QA/QC procedures, and assisted  team leader engineer with the preliminary and detail design of the Hotels and Residential structures

image00001 (1).png

June 2014-DEC 2014

albarari ashjar living

IMG_0591.PNG

APRIL 2014-JUNE 2014

The project is a 14.5 kilometre extension of the Dubai Metro from Nakheel Harbour & Tower Station to the Expo 2020 site in Dubai World Central.
ROLE AND RESPONSIBILITY
  • Assisted team leader  engineer to perform serviceability checks and produce reinforcement schedules and markups for floor system.

  • Produced markups for CAD draftsmen and checked them, assisted in the review of colleagues engineers to help meet deadlines.

bottom of page